Motorvation Engineering Sidecars and Trailers
This shows the position for the upper front mount clamp.
This shows the position for the lower front mount stud. An existing hole is enlarged and tapped to 1/2" X 20 threads to install this mount.
This shows the position for the lower rear mount stud. A hole is drilled in the frame and a bushing welded into the hole to support the stud.
This shows the position for the upper rear mount stud and clevis connection. A hole is drilled in the frame and a bushing welded into the hole to support the stud.
An overview of all four mounts and sidecar frame connections